IDOT District 6: US 67 Extension

Morgan County, IL

Klingner provided Phase II Engineering services for the extension of US 67 / IL 104 in Morgan County, IL. This section of expressway is 6.5 miles in length, beginning 0.2 miles East of Concord Road to 1.8 miles East of IL 100. The project an extension of a 3.7-mile portion, previously designed by Klingner, that began 1.2 miles East of Jacksonville.

The new expressway consisted of 6.5 miles of 4-lane pavement; a diamond interchange at Concord Road that included a structure carrying Concord Road over US 67; 22 access roads, frontage roads, service drives, and streets totaling 6.3 miles of reconstructed pavement; 500,000 cubic yards of furnished excavation; 14,000’ of culverts; and 37 light pole locations, including electric service installations. The project was constructed in five stages.